انت هنا الان : شبكة جامعة بابل > موقع الكلية > نظام التعليم الالكتروني > مشاهدة المحاضرة

plumbing_13

الكلية كلية الهندسة     القسم  الهندسة البيئية     المرحلة 3
أستاذ المادة رواء حسين كاظم العيساوي       07/07/2018 19:58:20
Plumbing and Drainage II

1- Cold water systems work and maintenance
2- Hot water systems work and maintenance
3- Locating the main components of domestic plumbing systems
4- Maintaining the system of pipes, tanks, fittings, and other apparatus
5- Sanitary drainage system
6- Vents and venting systems
7- Storm drainage systems
8- Layout and terminology of wastes and drains
Cold Water Systems Work

Public Water Mains:
a) Service mains shall be of adequate size to give the required rate of flow.
b) The mains shall be divided into sections by making loop system and with the provisions of valves.
c) To avoid dead ends, the mains shall be arranged in a grid formation or in a network.
Plumbing and Drainage II

1- Cold water systems work and maintenance
2- Hot water systems work and maintenance
3- Locating the main components of domestic plumbing systems
4- Maintaining the system of pipes, tanks, fittings, and other apparatus
5- Sanitary drainage system
6- Vents and venting systems
7- Storm drainage systems
8- Layout and terminology of wastes and drains
Cold Water Systems Work

Public Water Mains:
a) Service mains shall be of adequate size to give the required rate of flow.
b) The mains shall be divided into sections by making loop system and with the provisions of valves.
c) To avoid dead ends, the mains shall be arranged in a grid formation or in a network.


المادة المعروضة اعلاه هي مدخل الى المحاضرة المرفوعة بواسطة استاذ(ة) المادة . وقد تبدو لك غير متكاملة . حيث يضع استاذ المادة في بعض الاحيان فقط الجزء الاول من المحاضرة من اجل الاطلاع على ما ستقوم بتحميله لاحقا . في نظام التعليم الالكتروني نوفر هذه الخدمة لكي نبقيك على اطلاع حول محتوى الملف الذي ستقوم بتحميله .